Tuesday, January 24, 2012

Hoping for CO Thursday!

Lots of things happened very quickly! We are planning on getting our certificate of occupancy on Thursday.....
With that being said the house still may not be done 100%. If builders or contractors need to come in the house we will not be living there. 
We are really close though, take a look for yourself.....
Magnolia to the right

Palm trees down the driveway 

Two more magnolias 


Installing the screen for the porch

Concrete stairs foundation and bald cypress tree

Foundation for front stairs up close

Trex louvers are completed

Upstairs Jack and Jill bathroom


Upstairs counter top with Boeing Delivery Center windows by Fisher Recycling

Shower complete in Jack and Jill

Kitchen with cabinets

Master bathroom vanity 
Master bath full view 

Close up of a custom recycled glass countertop in master
Custom staircase railing installation

Master shower with glass on

Motorcycle room coat rack 









Another view Motorcycle room coat rack

Motorcycle room 


First floor bathroom 

Matt, Jon and I installed FLOR carpet tiles in theater

Full view of carpet tiles from back

Tiles from front of room 

Tiles with metal edge trim in theater
As you can see we are getting close. Matt, Jon and I installed the carpet last weekend. The FLOR tiles look even better in real life! Today the homemade atrium chandelier was installed and it looks awesome. I will get pics tomorrow!

Sunday, January 15, 2012

Newest Pictures!

The house is coming together! Our wood floors are finished and all cabinets are installed! Doors are painted, handles and locks are installed! Doorbell is installed, porch ceiling is on, rack for theater is installed.....Getting closer! Super excited!
Back door painted black 
Door Bell Dinger
Detached Garage Door painted 
Doorbell! 
Another office pic
Master Bedroom wood floors


Kitchen from living room

Red Cabinets in the office, hard to see with under cabinet lighting 
Office cabinets in daylight 

Wood floors on second floor at top of atrium
Ground Floor start wood floors
Looking up stairs from landing in living room
Looking down on stairs
Stairs to third floor 
Wood Floors in living room
Spare bedroom green room floor

Spare bedroom blue room floor
Porch ceiling 
Rack in theater is installed















Sunday, January 8, 2012

December Update

Over the Boeing break Jon and I did a bunch of work at the house to help it along. We had fun doing it and I am most proud of the structured media panel as I have never done one before and managed to do this one pretty neatly for a first timer, or so I think.
We have also started moving stuff little by little into the detached garage to prepare for our January 31 move out of the rental on Treadwell Street. We have begun to do the "deep" clean for move out and hope to be out of Treadwell by 1/28 so we can do some final touch ups. 
Hardwood floors are in and will be sanded and finished next week. Jon and I epoxy'd the detached garage floor and will be working on the main garage in the next two weeks. All cabinets are assembled and almost all are installed. Temporary stair treads are being installed for the time being. The stairs in the atrium should have a railing installed soon. Take a look at the pics....we will be taking more in the next week with more progress so check back next Sunday. 
Structured Media Panel 
Detached Garage Floor Epoxy'd
Office Door - Finally
Another view of SMP
Half Bath next to Theater 





Theater ready for final paint
Office cabinets and counters installed


Another view of office

Half Bath lights 


Motorcycle Closet with Cabinets Installed
Staircase in Atrium from above
Staircase in Atrium




Master bathroom dual flush toilet 
Trim on the windows in master bedroom

Master bath vanity


Laundry Room 
Cat Bathroom in Laundry Room
Staircase to 3rd floor almost finished!

Kitchen almost done! 


The pictures are a cluster because I got tired of fussing with them so sorry for the sporadic layout!

I really hope that we can get in sooner than the 28th but there is still a lot of work to be done! Every day people are there for 12-15 hours making sure they get the most of their day at our house, which we appreciate!

Cross your fingers everyone for an earlier move in :-)