Saturday, December 17, 2011

December 16 Update

Blog is updated. Sorry I didn't have the patience to sit and put them in order today. This blog is not the easiest thing to deal with and I didn't feel like re-writing the html so it was formatted correctly.  All progress is below. We are going to the house today to seal the concrete floors on the first floor and work on fixing some switches. Enjoy!
From the neighbors lot
Another angle from street                         
Sliding door without doors on it, Nichiha is done
Detached garage with lights
Louvers with cement pads below for patio and walkway 
From the street 
The green wall behind the bookshelf, more to come  
All louvers from detached garage
Installed ceiling speakers 
Cat 6, phone and cable 
Master bedroom tv hole and speakers
Master bedroom paint color 
Half bath by kitchen wall behind toilet 
Theater wall painted all black
Cement pad with HVAC and soon to be rain barrel
Cement pads up close 
3rd floor bathroom, lights installed and tiled
3rd floor bath shower 
Theater colors 
Green wall again 
Laundry Room Tile
Master shower tile
Color of one upstairs bedroom :-)
Half bath near kitchen