Over the Boeing break Jon and I did a bunch of work at the house to help it along. We had fun doing it and I am most proud of the structured media panel as I have never done one before and managed to do this one pretty neatly for a first timer, or so I think.
We have also started moving stuff little by little into the detached garage to prepare for our January 31 move out of the rental on Treadwell Street. We have begun to do the "deep" clean for move out and hope to be out of Treadwell by 1/28 so we can do some final touch ups.
Hardwood floors are in and will be sanded and finished next week. Jon and I epoxy'd the detached garage floor and will be working on the main garage in the next two weeks. All cabinets are assembled and almost all are installed. Temporary stair treads are being installed for the time being. The stairs in the atrium should have a railing installed soon. Take a look at the pics....we will be taking more in the next week with more progress so check back next Sunday.
Structured Media Panel |
Detached Garage Floor Epoxy'd |
Office Door - Finally |
Another view of SMP |
Half Bath next to Theater |
Theater ready for final paint |
Office cabinets and counters installed |
Another view of office |
Half Bath lights |
Motorcycle Closet with Cabinets Installed |
Staircase in Atrium from above |
Staircase in Atrium |
Master bathroom dual flush toilet |
Trim on the windows in master bedroom |
Master bath vanity |
Laundry Room |
Cat Bathroom in Laundry Room |
Staircase to 3rd floor almost finished! |
Kitchen almost done! |
The pictures are a cluster because I got tired of fussing with them so sorry for the sporadic layout!
I really hope that we can get in sooner than the 28th but there is still a lot of work to be done! Every day people are there for 12-15 hours making sure they get the most of their day at our house, which we appreciate!
Cross your fingers everyone for an earlier move in :-)